Kling 4.0 Flash early access: how to tell what Sume lists

Kling 4.0 Flash opened to a limited group on Sept 28 with full launch in October. On Sume, a model is callable when the live catalog lists it.

4 min readSume
All posts

Kling says Kling 4.0 Flash became available to a limited group for early access on September 28, and that the full Kling 4.0 launches officially in October. If you are not in that group, treat it as not callable; on Sume the check is the live catalog, not a vendor announcement.

What exactly did Kling announce?

From the Kling blog read 2026-10-01: early access for Flash on Sept 28 to a limited group, with the all-new Kling 4.0 launching in October as part of the lineup.

How do I tell what is callable on Sume?

Catalog signals in the Sume video docs, read 2026-10-01.
SignalWhat the docs say
Provider gatingA Motion Transfer model is documented as listed only when its provider is configured
LimitsNot uniform; seedance-2.5 takes 4-30 seconds, other catalog models top out at 15
SizingEach model advertises supported_resolutions

What should I do while waiting?

Build against the models the catalog returns now and read limits from it rather than hard-coding them. Which Kling model Sume lists today is covered in Kling 4.0 API availability; the video docs describe the endpoint.

Will Sume list Kling 4.0 in October?

No Sume page cited here promises a date. Re-read the catalog after Kling's launch instead of assuming.

Sources

Related posts

More in Models

All Models posts

Written by Sume